Case Study 5

 

After the shakedown a full 1 hour dry run was undertaken, monitoring the lines for:

  • Voltage
  • Motor & Gearbox temperatures
  • Current
  • Heater temperatures

After the 1 hour dry run had been completed successfully the line was handed over to the customer.

 