The relocation of a seal manufacturer from Southampton to Derby and fit out the new site with a chilled water system, compressed air ring main and power to all the machinery.
A total of 36 machines were moved and the project took 6 weeks including the site services. Working with the customers project manager we were able to offer a complete turn key project.
A 300M 75mm diameter ABS plastic chilled water ring main and a 300M 50mm diameter galvanised air ring main were installed at 4 meters from the floor level. To keep cost to a minimum the routes of the pipe work were directed over the proposed location of each machine, this also allowed the cable tray to be fitted from the same fixings. The chilled water and compressed air circuits were commission tested and full documentation issued to verified the installation.
Before any of the machines were disconnected all of their hydraulic tanks were pumped clean by a special purpose road tanker and a documentation of disposal was issued.